EUROPEASIAMIDDLE EAST

GOVERNMENT | PRIVATE | CRITICAL INFRASTRUCTURE | PROJECT BASED | ONGOING MANAGEMENT

Metzner Project Management's Director, Ralf Metzner has a remarkable depth of experience across a range of public and private sector projects. This diversity of experience underpins the way we approach all facets of engineering and project management.

PROJECTS IN ASIA

EMAL Aluminium Smelter Greenfield Construction Phase 2

Multi Billion US Dollar Capital Investment

> Phase 2 – Project Management of 30,000t structural – Largest single-site aluminium smelter in the world, 4 electrolysis halls at 1.2km length each, casthouse, anode baking furnace and storage, rodding shop and storage

> Specification preparation (Lessons Learnt Phase 1), Design Management (statics and workshop processes), Tender process, Fabrication and Installation phases

> Designs incorporating possibilities for future extensions, Cost savings (Request for Concession process) evaluation and careful selection, fast-track project schedule – complex decisions within minimum turnaround time aided by automated processes (Workflows)

EMAL Aluminium Smelter Greenfields Construction Phase 1 – Abu Dhabi, United Arab Emirates

Multi Billion US Dollar Capital Investment

> Engineering and Construction Management/Coordination across a multi-national team with satellite offices around the world – Lead Civil/Structural/Architectural (CSA) Field Engineer

> Infrastructure Installations (50,000 stone columns, 3,000 reinforced concrete piles, underground services, buildings and roads)

> Resolving/Answering all contractor CSA queries, Determining solutions for non-conformances, Vendor documentation review

 

PROJECTS IN EUROPE

Corrugated Sheetfeeder Plant Greenfield Construction – Strykow, Poland

75million Euro Capital investment

> Head Project Manager – responsible/accountable for all aspects of the project

> Highly complex - fully automated technology design, fast-track schedule, tight budget – requires rigorous scope definition, contractor selection and change management, cross-organisational large project team

Evaporated Salt Production Plant Greenfield Construction – Stassfurt, Germany

141 million Euro Capital investment

> Engineering Management, Construction coordination and onsite Quality Control - Project Lead Civil / Structural / Architectural (CSA) – responsible and accountable for the CSA component of the project

> Cost-effective design solution development, Single point of contact for all CSA matters, Establishing Quality Assurance and Quality Control procedures (Inspection and Test Plans) ensuring a high-quality product, Developed automated workflow processes for Requests for Information and Requests for Concession

> Earthworks, reinforced concrete structures, structural steel, storage tanks, architectural finish and fit-out, fire safety compliance, Close interface management with technology and mechanical (Piping, HVAC)

Steel Heat Treatment Line Greenfield Construction – Ilsenburg, Germany

184 million Euro Capital Investment

> Head Project Manager – responsible/accountable for all aspects of the project

> Highly complex, heavy industry plant (30,000m2 floor space), establishing project management structure/framework, systems and team

OUR PARTNERS, COLLABORATORS & CLIENTS
AK Environmental Logo - Grey Green Tilted Cropped PTY LTD - Outlook sig file logo 300 dpi
8f41c5d9-7d63-495d-9e27-9461a12b19b1
download (2)
Logos-01
incitec pivot
download (1)
Dungog_Shire_BW
city_of_wga_wga_logo_-cww-logo_rgb_fullcolour_nopadding
Central_coast_logo3
2021-03-22-063155.944466Midcoast